
Columbia Children’s Arboretum Improvements
Winterbrook is assisting NNA Landscape Architecture with environmental documentation and permitting for trail and shelter improvements at the Columbia Children’s Arboretum.
Winterbrook is assisting NNA Landscape Architecture with environmental documentation and permitting for trail and shelter improvements at the Columbia Children’s Arboretum.
Winterbrook leads the local land use and environmental permitting tasks for a planned new seismic-resilient water main below the Willamette River.
Winterbrook worked with the college on a major building expansion for new classroom and student services building (Building 7), and later for space to expand dining, student activities, classrooms, and the bookstore (Building 5).
Winterbrook is assisting NNA Landscape Architecture with environmental documentation and permitting for trail and shelter improvements at the Columbia Children’s Arboretum.
Winterbrook leads the local land use and environmental permitting tasks for a planned new seismic-resilient water main below the Willamette River.
Winterbrook conducted wetland delineations and obtained DSL concurrence for two sites along NE Force Avenue in Portland.
Winterbrook served as consultant lead for land use, environmental, and greenway planning and permitting on a series of BES projects designed to remove Combined Sewer Overflows (CSOs) from the Willamette River.
Winterbrook assisted in determining final layout of proposed improvements so as to have minimal impact on surrounding natural resources and to ensure compliance with numerous regulations and drafting extensive findings and preparing photographic exhibits.
Recent Comments